![]() ![]() ![]() We invite all lecturers, postgraduate students and researchers to contribute for manuscript submission. AVIA has a strong partnership with MIMEC UTM, ICASA ITB, IC-STAR Unila, AVINER Unsurya, and open a collaboration opportunity for publication with other international conference organizers. The publication schedule is planned to be two times per year: June and December. AVIA topics are including, but limited to: aviation sciences and technology, aerospace engineering, aeronautics, defence system and engineering, mechanical engineering, and electrical engineering. Also, general engineering papers related to Aviation and Aeronautical are also welcome. ![]() International Journal of Aviation Science and Engineering accept original articles and critical review manuscript in the field of Aviation Science and Engineering, Mechanical Engineering and Electrical Engineering. 3 Issue 2, December 2021 AVIA will broader its aim and scope. Untuk contoh mudahnya saya ambilkan dari proyek yang kapasitasnya kecil (gue belum dapat persetujuan untuk mempublikasikan RAB, RAP dan kurva S proyek yang gue gunakan sebagai obyek Proyek Akhir. AVIA : International Journal of Aviation Science and Engineering is published by Faculty of Mechanical and Aerospace Engineering, FTMD Institut Teknologi Bandung, in cooperation with Faculty of Engineering, Universitas Lampung and Java Scientific Academy, Indonesia.įollowing with the high demand on the scientific publication among the Indonesian lecturer and researches in the field of engineering science and technology, start from the next issue, i.e., Vol. Kemudian setelah jumlah duit berhasil diketahui, maka kontraktor dapat melangkah ke pembuatan kurva S. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |